Menu
UKR
ESP
RUS
RUS
Youtube
Facebook
News subscription
Back
Launch of 2 charcoal kilns CK-4 EURO in South America - Brazil

In November 2017 in Corumba, Brazil, the charcoal production complex consisting of two units of the charcoal kiln CK-4 EURO was successfully put into operation. Along with the launch, our specialists conducted training and certification of the personnel and accompanied the first operating cycles of the equipment.

Trolleys ready to be loaded into the kiln

Trolleys with the raw materials

Hardwood was used as raw material for charcoal production. The results are illustrated in the photos below.

Wood for carbonization  Ready charcoal

Trolleys with the charcoal

email
×

You`ve entered incorrect E-mail address

×

Entered E-mail is already in newsletter

×

You succesfully subscribed to our news

   +38 050 98 80 478    ‎+38 099 067 09 53

GreenPower 

piroliz@greenpower.com.ua